Set F — Cut-path bug drain
The 11 high-priority bugs open at 2026-08-17, ten of which sit on the release/cut path — the machinery a release toolkit IS. None was in any milestone before this, so none could block a cut or be finished. Drains before the v1.0.0 stability commitment (Phase 10), because that commitment is a state-assertion this substrate must actually back. Named 'Set' per the Set D / Set E drain convention rather than 'Phase', since these are defects surfaced across phases rather than a migration stage.
No due date
100% Completed