chore(release): v0.3.3 #44

Closed
forgejo-actions wants to merge 1 commit from release-prep/v0.3.3 into main

Internal

  • .forgejo/workflows/_debug-event-payload.yml (consumer-side, temporary): diagnostic workflow firing on pull_request.closed events that logs the full github.event JSON + individual field evaluations (head.ref, head.label, merged, startsWith() test). Surfaces the data needed to root-cause #41 — why the consumer-side release-draft.yml line 28 expression evaluates to empty. This workflow will be REMOVED once #41's right-layer fix lands (tracked on the issue). Disposition (A) per Surveyor e455 framing: probe first, don't fix on hypothesis.
### Internal - **`.forgejo/workflows/_debug-event-payload.yml`** (consumer-side, temporary): diagnostic workflow firing on `pull_request.closed` events that logs the full `github.event` JSON + individual field evaluations (`head.ref`, `head.label`, `merged`, `startsWith()` test). Surfaces the data needed to root-cause [#41](https://git.frankenbit.de/frankenbit/release-toolkit/issues/41) — why the consumer-side `release-draft.yml` line 28 expression evaluates to empty. This workflow will be REMOVED once #41's right-layer fix lands (tracked on the issue). Disposition (A) per Surveyor e455 framing: probe first, don't fix on hypothesis.
chore(release): prepare v0.3.3
Some checks failed
debug-event-payload / dump github.event JSON (pull_request) Successful in 2s
release-draft / create Forgejo draft release (pull_request) Failing after 4s
release-draft / draft (pull_request) Failing after 0s
976e377e0d
Generated by release-toolkit release-prep.sh.

Tracker: frankenbit/release-toolkit#1
quartermaster closed this pull request 2026-06-24 23:06:28 +02:00
Some checks are pending
debug-event-payload / dump github.event JSON (pull_request) Successful in 2s
release-draft / create Forgejo draft release (pull_request) Failing after 4s
release-draft / draft (pull_request) Failing after 0s
go-ci / lint + build + test (pull_request)
Required
pr / gates (pull_request)
Required
tests / bats (pull_request)
Required
tests / checks (pull_request)
Required
toolkit-self-gates / toolkit-self gates (PR's own rt) (pull_request)
Required

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
frankenbit/release-toolkit!44
No description provided.